Notes
Blog
Occasional notes from the lab.
Splitting the Boulder
A one-ton mini excavator could move half of it — but not the whole thing. So we traded brute force for geometry, drilled five deep holes along the stone's natural fracture, and let expansive grout work the night shift.
Read the field note →
In the Pipeline
Field Note 002 — moving the two halves. Plus build logs from the
software studio, long-term tool reviews, and experiments where CAD,
sensors, and AI meet dirt and steel. New notes land as projects
finish, not on a content calendar.